Project Overview
The Madison Lenox Hotel, built in the early 1900s, had two 8-story towers (the Madison and the Lenox) connected by a two- story building, and spanned nearly a full block in downtown Detroit. Due to the poor condition of the structure, no pre-demolition environmental testing could be completed, meaning that the building had to be demolished and all materials handled and disposed of as asbestos containing materials.
Work on the emergency, ordered demolition project was temporarily stopped by court order, pending resolution of a dispute between the ordering body of the City of Detroit and two local preservation groups. As the building had been condemned as unsafe by the City, the court allowed the demolition to continue. The site was prepared and used as parking for the Superbowl hosted by the City in 2006.
Demolition begins on the multi‐story former hotel in congested downtown Detroit in 2005.
The demolition area consisted of 120,000 square feet.
The project utilized 1,950 man hours with zero lost time worker injuries.
Water helps to suppress dust as the debris is hauled away.
The project was completed ahead of schedule with 400 cubic yards of debris removed and 135 tons of scrap metal recycled.