Project Overview
Adamo performed the Farmington Hills DPS Water Supply System Improvements, Water Storage Tank Site Work.
The project involved removing and installing new approaches; repairing a portion of Halsted Road; installing new site storm drainage, new drive and parking lot paving on the site; and construction of a storage structure and entry/exit gates with security card reader systems.
Adamo Group installed a new site storm sewer at the City of Farmington Hills Department of Public Works (DPW).
Storm sewer work was performed with a variety of Adamo’s Caterpillar equipment, including its 330 crawler excavator, 966 loader, 416 backhoe, and 533 vibratory roller.