Bayer CropScience Pipe Decommissioning and Demolition Project West Virginia

Bayer Steam Piperack

Bayer CropScience Pipe Decommissioning and Demolition Project West Virginia

Due to our current contract requirements we are unable to present actual photos of this project. We would be more than happy to discuss this type of project and the challenges presented to us and how we overcame them by calling us directly.

Institute Plant Methomyl Hopper Demolition West Virginia

Adamo Group Prepares Frame For Removal At Bayer Cropscience

Institute Plant Methomyl Hopper Demolition West Virginia

BASF, Wyandotte

Basf Na Headquarters

BASF, Wyandotte

Due to our current contract requirements we are unable to present actual photos of this project. We would be more than happy to discuss this type of project and the challenges presented to us and how we overcame them by calling us directly.

BASF, Southfield

Basf Southfield Aerial 01

BASF, Southfield

Due to our current contract requirements we are unable to present actual photos of this project. We would be more than happy to discuss this type of project and the challenges presented to us and how we overcame them by calling us directly.

Cabot Industries

Cabotindustries Aerial

Cabot Industries

Due to our current contract requirements we are unable to present actual photos of this project. We would be more than happy to discuss this type of project and the challenges presented to us and how we overcame them by calling us directly.

Bayer CropScience MPP Project Kansas City

Bayer, Kansas City

Bayer CropScience MPP Project Kansas City

Adamo completed the environmental decommissioning and demolition of the MPP Building, Sencor Silos, K4 Formulation Equipment, Benz System, Deaerator System, tank farm and ancillary structures at the Bayer Crop Science Kansas City Plant.

Dow, Midland

Dow Flags

Dow, Midland

Asbestos abatement and demolition of Buildings 290 and 566 and two tanks farms and their related piping in Midland, Michigan.  NOTE:  DOW Chemical Co. only approves 8 firms to bid demolition work throughout the country for all of their facilities.  Adamo has been chosen as one of these bidders, following a rigorous selection and approval process.

Due to our current contract requirements we are unable to present actual photos of this project. We would be more than happy to discuss this type of project and the challenges presented to us and how we overcame them by calling us directly.

Marathon Ashland Detroit

Hall Slide 4

Marathon Ashland Detroit

Adamo has been contracted to perform both total and selective demolition projects in Marathon’s Detroit plant, including CAT Heaters, process piping, tank extraction and ancillary building demolition for plant expansion.

Due to our current contract requirements we are unable to present actual photos of this project. We would be more than happy to discuss this type of project and the challenges presented to us and how we overcame them by calling us directly.

Pfizer, Inc.

Pfizer

Pfizer, Inc.

Adamo Group performing the demolition of the 660,000 sq. ft. Pfizer, Inc. administrative building in Portage, Michigan.