Adamo excavated and cleaned out the sinkhole, made repairs to the 5’ diameter combination sewer and coordinated repairs to AT&T conduits, a Public Lighting Department vault and an existing 8” water main. Adamo also provided traffic control for the 4 month period until the repairs were complete and the intersection was repaved.